Ancillary Dwelling Rules in WA 2026: The 70 sqm Granny Flat, R-Codes Compliance and the Building Permit

Western Australia has the most streamlined granny flat rules in Australia. An ancillary dwelling of up to 70 m² on a lot with a single house needs no planning approval if it is deemed-to-comply with the R-Codes, there has been no minimum lot size since April 2024, and the dwelling can be rented to anyone. This guide explains what the R-Codes require, when a proposal falls out of the deemed-to-comply pathway and needs planning approval, how the building permit works, and what applies to tiny houses on wheels and non-habitable studios.

Portable Tiny Homes delivers steel-framed homes from 13 m² to 57 m² to Perth and the South West, including a 57 m² Class 1a Granny Flat specified to meet Class 1a requirements. Our Council Approval Guidance covers our models; this article covers the WA rules.

What the R-Codes say

State Planning Policy 7.3, the Residential Design Codes, defines an ancillary dwelling as a self-contained dwelling on the same lot as a single house, which may be attached or detached. The deemed-to-comply provisions in 2026 are:

Deemed-to-comply: no planning approval

If the ancillary dwelling meets every deemed-to-comply provision, the Planning and Development (Local Planning Schemes) Regulations exempt it from needing development (planning) approval. You go directly to your local government for a building permit. There are two routes: a certified application, where a private building surveyor issues a Certificate of Design Compliance and the local government must decide within 10 business days, and an uncertified application, where the local government assesses the design itself within 25 business days. For a factory-fitted home with engineering already certified, the certified route is fast and predictable.

When planning approval is needed

A proposal falls out of the exemption and needs development approval from the local government if it breaches a deemed-to-comply provision (for example a reduced setback or more than 70 m²), if the lot is heritage-listed or in a heritage area, if a local planning scheme or policy imposes additional requirements, or in some cases if the lot is in a bushfire-prone area with a BAL of 40 or FZ. Development approval typically takes 60 to 90 days. Most local governments (Stirling, Wanneroo, Joondalup, Armadale, Gosnells, Rockingham, Mandurah, Bunbury, Busselton) have local policies worth checking, but a compliant design on a standard residential lot rarely needs one.

Bushfire-prone land

Much of the Perth Hills, the Peel hinterland and the South West is designated bushfire-prone. A Bushfire Attack Level assessment is required before the building permit, and the dwelling must meet the corresponding standard (AS 3959). BAL-12.5 to BAL-29 are manageable specifications; BAL-40 and FZ are onerous and may not suit a portable home. Get the assessment early.

Class 1a vs Class 10a

An ancillary dwelling is a Class 1a building under the NCC (the national building code) and must meet the dwelling standard: energy efficiency, waterproofing, ceiling heights, smoke alarms. A backyard office, studio or store that no one sleeps in is Class 10a and follows the simpler outbuilding provisions; small outbuildings within the R-Code limits may be exempt from both planning and building approval. If you may ever rent the building or house someone in it, specify it as Class 1a from the start. Our state-by-state guide compares the classes across Australia.

Tiny houses on wheels in WA

A tiny house on a registrable trailer is a caravan under the Caravan Parks and Camping Grounds Act, not a building. Local governments generally allow a caravan on a private lot to be occupied for limited periods (often three nights, extendable to three months with approval) but not as a permanent residence, and not for rental. WA has no THOW pilot equivalent to those in NSW and Victoria. For permanent or rental use, a fixed ancillary dwelling on footings is the compliant route.

What the building permit application needs

  1. A site plan showing the lot, the main house, the ancillary dwelling, setbacks and open space.
  2. Architectural plans and elevations.
  3. Structural engineering certification for the building and footings, including wind region.
  4. Energy efficiency compliance for a Class 1a.
  5. A Certificate of Design Compliance from a registered building surveyor (certified route).
  6. A BAL assessment if the lot is bushfire-prone.
  7. Evidence of sewer or septic approval from the Water Corporation or local government.

Our homes come with the plans, engineering and energy compliance; you or your building surveyor add the site-specific items. City and regional detail is in our guides for Perth, Mandurah and the South West and the mining regions.

Approval note: the pathways described here are general information, not planning advice. Whether a particular site qualifies for any pathway is assessed by an independent building certifier and the relevant council, and approval is never guaranteed. Portable Tiny Homes works with independent certifiers and can connect you with one who assesses your site.

Frequently asked questions

Do I need planning approval for a granny flat in WA?

Not if it is deemed-to-comply with the R-Codes. You still need a building permit.

What is the maximum size of an ancillary dwelling?

70 m² plot ratio area.

Is there a minimum lot size?

No, since April 2024.

Can I rent it to anyone?

Yes.

How long does the building permit take?

10 business days for a certified application, 25 for an uncertified one. Request a quote and we can connect you with an independent building surveyor in your area.