Quick answer: a Class 1a granny flat is approved for your site, not in the factory. The steps are: check the site, engage an independent certifier to confirm the pathway, have footings engineered for your soil, lodge the application with the home’s plans and documentation, then deliver, connect and complete the final inspection. Our Class 1a Granny Flat is specified to meet Class 1a requirements and comes with the documentation your certifier needs, and we work with an engineer and independent certifiers who can help with the paperwork.

Last reviewed: 30 September 2026. Rules vary by state and council; confirm the pathway for your site.

This guide is for people who want a permanent dwelling or a rental, the use the Class 1a Granny Flat is designed for among our granny flats.

The process

  1. Site check. Get the planning certificate or property report for your lot, and photos of access and the placement spot.
  2. Certifier. An independent certifier (or council, where required) assesses which approval pathway applies to your site. We can connect you with one.
  3. Site information. Survey or site plan, soil classification, and any bushfire or flood assessment the site needs.
  4. Footing engineering. Footings are engineered for your soil and wind conditions.
  5. Application. Lodged with the home’s plans, engineering and energy documentation plus the site documents.
  6. Approval. Issued by the certifier or council. Timing depends on the pathway and the site.
  7. Delivery and set-up. The home is delivered packed down and set up on its engineered footings. See delivery day.
  8. Connections. Local licensed trades connect power, water and sewer.
  9. Final inspection. The certifier inspects and issues the final sign-off for occupation.

What we supply and what you supply

We supply You or your certifier supply
Home plans and elevations Site plan or survey
Structural engineering for the home Soil classification and footing design for the site
Energy compliance documentation Bushfire or flood assessments if needed
Access to an engineer and certifiers we work with Council or certifier fees

For how pathways differ by state, see our council approval guidance.

Approval note: the pathways described here are general information, not planning advice. Whether a particular site qualifies for any pathway is assessed by an independent building certifier and the relevant council, and approval is never guaranteed. Portable Tiny Homes works with independent certifiers and can connect you with one who assesses your site.

What slows an application down

Most delays come from the site, not the home. The home’s plans, engineering and energy documentation are ready when you order. These are the site issues that most often add time:

The $1,000 site assessment

Before you commit to the home, we arrange a site assessment with an engineer for $1,000. The report usually arrives within 15 business days and covers access, the position on your block, soil and footings, and anything on your planning certificate that affects the project. It gives your certifier a clear starting point and flags problems while they are still cheap to solve.

Questions to ask your certifier

  1. Which approval pathway applies to my lot, and why?
  2. What site documents do you need from me, and in what order?
  3. Are there setbacks, height or floor area limits that affect a 57 m² home?
  4. What inspections happen during set-up, and what is needed for the final sign-off?
  5. Roughly how long does this pathway take in my council area?

Our council approval guidance explains the pathways by state.

Frequently asked questions

Is the Class 1a Granny Flat pre-approved?

No home is approved in the factory. It is specified to meet Class 1a requirements; approval is for your site.

Who lodges the application?

You or your certifier, because it is tied to your land. We supply the home’s documentation.

How long does approval take?

It depends on the pathway and the site. Your certifier can give a timeframe.

How do I start?

Request a quote with your address.

What does the site assessment cover?

Access, the position on your block, soil and footings, and planning certificate issues. It costs $1,000 and the report usually arrives within 15 business days.

Can site work start before approval?

Generally, no. Footings and connections follow the approved plans, so ask your certifier before any work starts on site.