Council Approval for a Tiny House or Portable Home: State-by-State Guide (2026)

The short answer to do I need council approval for a tiny house is: usually yes for anything you will live in, and often no for a small non-habitable cabin or studio. The longer answer depends on which state you are in, how big the building is, whether it sits on wheels or on footings, and whether someone will sleep in it. This guide sets out the rules for every state and territory as they stand in 2026, so you can work out your pathway before you order.

Portable Tiny Homes delivers steel-framed, fully engineered homes from 13 m² to 57 m² across NSW, ACT, Queensland and Western Australia. Our Council Approval Guidance page covers our own models in detail; this article is the broader picture.

Class 1a vs Class 10a: the distinction that decides everything

The NCC, the national building code, sorts buildings into classes. Two matter here. A Class 1a building is a dwelling: somewhere a person lives, with a kitchen, bathroom and sleeping space. A Class 10a building is a non-habitable structure such as a shed, garage, studio or home office. The class sets the approval pathway, the building standards (insulation, energy rating, waterproofing, smoke alarms) and what you are allowed to do with it.

If you intend to rent the building out, house a family member full time, or list it on Airbnb, it must be a Class 1a secondary dwelling (often called a granny flat) and it needs both planning and building sign-off. If it is a backyard office, a teenage retreat used during the day, or a guest room with no kitchen, a Class 10a pathway is usually simpler and sometimes exempt. Our Class 1a Granny Flat is specified to meet the dwelling standard; the Nook, Mini Cottage, Cabin and Cottage models can be supplied either way depending on your use.

Tiny house on wheels: a caravan, not a building

A tiny house on wheels (THOW) that is registrable as a trailer is generally treated as a caravan, not a building, so the NCC does not apply. Instead, local caravan rules apply. In most states you can park a caravan on a property you own and use it for short stays, but living in it permanently on a block that already has a house is restricted or capped in days per year. Several councils are now trialling exemptions: Shellharbour in NSW and Surf Coast in Victoria both have pilots running to December 2026, and Mount Alexander Shire in Victoria has removed permit requirements entirely for THOWs on properties with an existing dwelling. If you are on the Illawarra, see our Shellharbour and Illawarra page.

The trade-off is that a THOW cannot usually be rented on the open market, may not be financed by a bank as property, and does not add to the valuation of your land the way a Class 1a dwelling does. For most buyers who want income or long-term family accommodation, a fixed portable home on footings is the better route.

New South Wales

NSW has the clearest fast track in the country. Under the Housing SEPP, a secondary dwelling of up to 60 m² can be approved as complying development in about 20 days through a private certifier, provided the lot is at least 450 m², the dwelling meets setback and height rules, and the land is not bushfire or flood constrained in a way that triggers a full DA. You can rent the granny flat to anyone. Lots under 450 m² or with overlays go through a development application with council, which typically takes two to four months.

Non-habitable cabins under 20 m² (or larger in rural zones) may qualify as exempt development with no approval at all, provided they meet setbacks and are not used as a dwelling. Read our guides on tiny houses in NSW and portable granny flats in NSW for the detail.

Queensland

Queensland removed the rule that a secondary dwelling could only be occupied by household members in September 2022, so a granny flat anywhere in the state can now be rented to anyone. Maximum size and setbacks are set by each council’s planning scheme rather than by the state, and most South East Queensland councils (Brisbane, Gold Coast, Sunshine Coast, Moreton Bay, Logan, Ipswich) treat a compliant secondary dwelling as accepted development that needs no planning approval, only a building approval from a private certifier. Check your council’s scheme for the size cap (commonly 60 m² to 80 m²) and the requirement that the dwelling shares services with the main house.

Western Australia

WA calls a granny flat an ancillary dwelling. Under the R-Codes it can be up to 70 m², and since April 2024 there is no minimum lot size. If the design is deemed-to-comply with the R-Codes, no planning approval is needed and you go straight to a building permit through your local government. Ancillary dwellings can be rented to anyone. WA is now one of the simplest states to add a portable home in, which is one reason enquiries from Perth, Mandurah and the South West have grown so quickly. See our Perth page.

South Australia

SA raised its cap for ancillary accommodation from 60 m² to 70 m² in November 2024. Planning consent and building consent are both always required, lodged through the PlanSA portal, but a deemed-to-satisfy pathway means a compliant design is assessed quickly. Rental to non-family members is permitted.

Victoria

Since December 2023 a small second home of up to 60 m² on a lot over 300 m² needs no planning permit in Victoria, provided there are no overlays (heritage, bushfire, flooding) on the land. A building permit from a registered building surveyor is still required. The dwelling can be rented to anyone. Regional councils including Surf Coast and Mount Alexander have gone further for tiny houses on wheels.

Tasmania, ACT and Northern Territory

Tasmania allows ancillary dwellings up to 60 m², often as No Permit Required if standards are met, and the state released a dedicated Tiny Houses Fact Sheet in December 2024; a proposal to raise the cap to 90 m² is under consultation. The ACT permits secondary residences of 40 m² to 90 m² depending on block size, but development approval is normally required and the process is slower than NSW. The Northern Territory allows independent units up to 75 m², with planning approval not always required if the NT Planning Scheme standards are met. For Canberra buyers, see Container Homes Canberra.

What every approval will ask for

Regardless of state, expect to supply a site plan showing setbacks and the location of the main house, engineering certification for the building and its footings, energy efficiency compliance (a 6 or 7 star NatHERS rating for a Class 1a), a bushfire attack level (BAL) assessment if you are in a bushfire zone, a stormwater and services plan, and a BASIX certificate in NSW. Because our homes are factory-fitted and engineer-certified, most of this documentation comes with the home. What you or your certifier add is the site-specific material: the survey, the BAL rating and the services connection plan.

A simple decision path

  1. Decide the use: sleeping and cooking full time (Class 1a) or daytime use only (Class 10a).
  2. Check your lot size and zoning on your state planning portal.
  3. Check overlays: bushfire, flood, heritage, easements.
  4. If Class 1a and compliant, engage a private certifier (NSW, QLD, VIC, WA) or lodge via PlanSA (SA).
  5. If Class 10a, confirm whether the size qualifies as exempt development.
  6. Order the home only once you know the pathway and the timeframe.

Approval note: the pathways described here are general information, not planning advice. Whether a particular site qualifies for any pathway is assessed by an independent building certifier and the relevant council, and approval is never guaranteed. Portable Tiny Homes works with independent certifiers and can connect you with one who assesses your site.

See our full range of tiny homes for sale, from the 13 m² Nook studio to two-bedroom expandable homes.

Frequently asked questions

Can I put a tiny house in my backyard without council approval?

Only if it is a small non-habitable structure that meets the exempt development rules for your state, or a registrable tiny house on wheels used under caravan rules. A home you sleep in permanently needs approval in every state.

How long does granny flat approval take?

Complying development in NSW takes about 20 days. Accepted development in Queensland and deemed-to-comply in WA can be faster, since only a building permit is needed. A full development application anywhere in Australia usually takes two to four months.

Can I rent out my granny flat to a stranger?

Yes, in every state and territory as of 2026. Queensland was the last to remove the household-only restriction, in September 2022.

Does a portable home count as a permanent building?

If it is placed on footings or a slab and connected to services, yes. Being transportable does not change its building class; the use does.

Who handles the approval, me or Portable Tiny Homes?

We supply the engineering, plans and compliance documentation for the home and work with independent certifiers in the areas we deliver to and can connect you with one. You or your certifier lodge the application, because it is tied to your land. Request a quote and tell us your suburb and intended use, and we can connect you with an independent certifier who assesses which pathway applies to your site.