Quick answer: no side access does not rule out a granny flat. A complete portable home can be lifted over the house by crane and set down on footings in the backyard, often in a single day. What matters is where the crane can stand, how far it has to reach, overhead power lines and trees, and any traffic control on the street. Battle-axe blocks with a long driveway can often take a truck instead.
Last reviewed: 30 September 2026.
Many suburban houses fill the width of the block. This guide explains how our granny flats reach backyards without a side path.
How a crane lift works
- The home arrives on a truck and parks in the street or driveway.
- A mobile crane, positioned at the front, lifts the home over the house.
- It is set down on footings prepared in advance.
- Local licensed trades then connect services.
See what happens on delivery day.
What decides whether it can be lifted
| Factor | Why it matters |
|---|---|
| Crane position | A firm, level spot close to the house shortens the reach |
| Reach distance | The further back the home goes, the bigger the crane |
| Power lines | Overhead lines may need to be isolated or avoided |
| Trees and roofs | Clearance over the house and garden |
| Street | Narrow streets may need traffic control or a council permit |
Battle-axe blocks
On a battle-axe block the access handle may be wide enough for a truck to drive to the rear lot. If not, a crane can lift from the street or the handle. Check the width, any gates and overhead lines.
Costs to plan
Crane hire, and sometimes traffic control, add to the installed total. The larger the crane and the longer the lift, the higher the cost. Send photos from the street and the backyard so the lift can be assessed. See our hidden costs guide.
Approval note: the pathways described here are general information, not planning advice. Whether a particular site qualifies for any pathway is assessed by an independent building certifier and the relevant council, and approval is never guaranteed. Portable Tiny Homes works with independent certifiers and can connect you with one who assesses your site.
Which homes can be lifted in
Our relocatable homes are lifted into place by crane, so no side access is needed if a crane can reach the spot. The Nook arrives as one fitted unit; the Mini Cottage, Cabin and Cottage are expandable homes that travel folded and open out once they are in position. These are the overall footprints from our current plans:
| Home | Overall size | Good fit for | Price inc GST |
|---|---|---|---|
| The Nook | 2,260 x 5,936 mm | Studio, office or guest room | $23,900 |
| The Mini Cottage | 5,886 x 4,265 mm | One person, open plan living | $30,900 |
| The Cabin | 5,900 x 6,420 mm | Two bedrooms at the lowest price | $29,900 |
| The Cottage | 5,850 x 6,300 mm | A parent or couple, full kitchen | $34,900 |
The Class 1a home is different: it is delivered packed down and set up on engineered footings, so access is planned as part of its $1,000 site assessment with an engineer.
What to send us before you book a crane
- A photo of the street from the front of the house, showing power lines and trees.
- A photo of the front of the house and the roofline.
- A photo of the spot in the backyard where the home will go.
- A rough measurement from the kerb to that spot.
- Anything unusual: a steep driveway, a narrow street, or a pool in the way.
From these we can advise how the home can be placed and what your crane company will need to know. You book the crane, and the crane company confirms the crane size, its position and anything else needed, such as a traffic plan or an early start.
On the day
The truck and crane set up in the street, the home is lifted over the house and lowered onto its piers, and the crew levels and secures it. Your licensed electrician and plumber connect services afterwards. See the delivery day guide for how the day runs.
Frequently asked questions
Can a granny flat be lifted over my house?
Often, yes, by mobile crane, subject to reach, power lines and street access.
Does a crane lift need a permit?
Sometimes, for street use or traffic control. The crane operator usually advises.
How long does it take?
The lift itself usually takes hours, not days.
How do I start?
Request a quote with photos from the street and the backyard.
Do I need a permit to put a crane in the street?
Sometimes. Councils have different rules for cranes and trucks on public roads. Your crane company can confirm what applies to your street and arrange any permit or traffic plan.
Can a home be lifted over a two-storey house?
Often, with a larger crane. It depends on the distance from the street and the space for the crane, which your crane company assesses on a site visit.
Who arranges the crane?
You do. You book a local crane company for delivery day, and we give them the home’s size and the delivery details they need and coordinate the timing with them.
What if a crane cannot reach the spot?
We look at other positions on the block or other ways in, such as from a rear lane. If no lift is practical, we will tell you before you commit.