Granny Flat Rules in South Australia 2026: The 70 sqm Ancillary Accommodation Limit and PlanSA Approval

Granny flat rules in South Australia changed in November 2024, when the state lifted the size limit for ancillary accommodation from 60 m² to 70 m². That brought SA into line with Western Australia and made a two-bedroom portable home a practical option on most Adelaide and regional blocks. Unlike NSW, Queensland and WA, South Australia has no exempt or complying pathway for a habitable dwelling: planning consent and building consent are always required, but a deemed-to-satisfy design is assessed quickly. This guide explains the rules, the PlanSA process, what applies to non-habitable studios and tiny houses on wheels, and the documents you will need.

Portable Tiny Homes supplies steel-framed homes from 13 m² to 57 m², including a 57 m² Class 1a Granny Flat specified to meet Class 1a requirements; South Australian deliveries are quoted individually. Our Council Approval Guidance covers our models; this article covers the SA rules.

What ancillary accommodation means

The Planning and Design Code defines ancillary accommodation as self-contained accommodation on the same allotment as a dwelling, used in conjunction with it. The key provisions in 2026:

Planning consent and building consent through PlanSA

South Australia runs a single online portal, PlanSA, for all development applications. An ancillary dwelling application includes both planning consent (assessed by the council or an accredited professional against the Code) and building consent (assessed by a building certifier against the NCC (the national building code)). If the design meets the Code’s deemed-to-satisfy criteria for the zone, planning consent follows a streamlined assessment without public notification, typically four to eight weeks in total. A design that departs from the criteria (larger, closer to a boundary, in an overlay) is assessed on merit, may be notified to neighbours, and takes longer. Once both consents are granted, development approval issues and work can start. Our state-by-state guide compares this with the other states.

Overlays that change the pathway

Hazards (Bushfire). Much of the Adelaide Hills, Fleurieu, Barossa hills and regional SA is in a bushfire protection area. A Bushfire Attack Level assessment is required and the dwelling must meet the corresponding standard; BAL-40 and Flame Zone may not suit a portable home. Historic Area and Character Area. Inner Adelaide suburbs (Unley, Norwood, Prospect, North Adelaide, Glenelg) and towns like Hahndorf and Strathalbyn carry design conditions on outbuildings and ancillary dwellings. Hazards (Flooding). Low-lying areas along the Torrens, Onkaparinga, Gawler and Murray rivers may require elevated floor levels. Native Vegetation. Rural blocks may need clearance consent for the site.

Class 1a vs Class 10a

Ancillary accommodation is a Class 1a building under the NCC and must meet the dwelling standard for energy efficiency, waterproofing, ceiling heights and smoke alarms. A backyard office, studio or store that no one sleeps in is a Class 10a outbuilding; small outbuildings within the Code’s limits (generally up to 15 m² and 2.5 m high in residential zones) may be exempt from approval, and larger ones follow the simpler outbuilding provisions. If you may ever rent the building or house someone in it, specify it as Class 1a from the start.

Tiny houses on wheels in South Australia

A tiny house on a registrable trailer is a caravan, not a building, and councils regulate it under local by-laws. Most allow a caravan on a private allotment to be occupied for short periods, but not as a permanent residence and not for rental. South Australia has no THOW pilot equivalent to those in NSW and Victoria. For permanent or rental use, a fixed ancillary dwelling on footings is the compliant route.

What the PlanSA application needs

  1. A site plan showing the allotment, existing dwelling, proposed ancillary dwelling, setbacks, site coverage and private open space.
  2. Architectural plans and elevations.
  3. Structural engineering certification for the building and footings, including the soil classification (Adelaide’s reactive clays often need engineered piers).
  4. Energy efficiency compliance for a Class 1a (NatHERS or deemed-to-satisfy).
  5. A BAL assessment if in a bushfire protection area.
  6. Wastewater approval: SA Water connection or an on-site wastewater system approval from council.
  7. Stormwater management details.

Our homes are supplied with the plans, engineering and energy compliance; you or your certifier add the site-specific documents. Regional detail is in our guides for South Australia and the Fleurieu, Hills, Barossa and regional SA.

Approval note: the pathways described here are general information, not planning advice. Whether a particular site qualifies for any pathway is assessed by an independent building certifier and the relevant council, and approval is never guaranteed. Portable Tiny Homes works with independent certifiers and can connect you with one who assesses your site.

Frequently asked questions

How big can a granny flat be in South Australia?

70 m² total floor area, since November 2024.

Do I need council approval for a granny flat in SA?

Yes. Planning and building consent are both required, lodged together through PlanSA.

How long does approval take?

Four to eight weeks for a deemed-to-satisfy design; longer for merit assessment.

Can I rent it to anyone?

Yes.

Where do I start?

Request a quote with your address and intended use, and we will suggest a model and connect you with an independent certifier who can assess the pathway for your site.