NSW Granny Flat Rules 2026: Complying Development, the 60 sqm Limit, Exempt Cabins and Tiny Houses on Wheels

NSW has the fastest granny flat approval pathway in Australia. Under the State Environmental Planning Policy (Housing) 2021, a secondary dwelling of up to 60 m² on a lot of at least 450 m² can be certified as complying development by a private certifier in around 20 days, with no council development application, and can be rented to anyone. This guide explains the thresholds, what pushes a proposal into a DA, how exempt development works for non-habitable cabins, what applies to tiny houses on wheels, and the documents a certifier needs.

Portable Tiny Homes has delivered steel-framed homes from 13 m² to 57 m² across NSW since 2019, including a 57 m² Class 1a Granny Flat specified to meet Class 1a requirements. Our Council Approval Guidance covers our models; this article covers the NSW rules.

The Housing SEPP secondary dwelling pathway

The Housing SEPP permits one secondary dwelling on a lot with a principal dwelling in most residential zones (R1 to R5) and, where the local environmental plan allows, in rural zones. The dwelling must be on the same lot, cannot be subdivided or separately titled, and there is no restriction on who occupies it. The complying development standards in 2026 are:

A compliant proposal is lodged with a private certifier (or council acting as certifier) as a Complying Development Certificate, typically issued in 10 to 20 business days. Our state-by-state guide compares this with the other states.

What triggers a development application

A DA to council is needed if the lot is under 450 m² or has a frontage under 12 m, if the design breaches a Code standard (size, height, setback, site cover), if the land is in a heritage conservation area or is a heritage item, or in some cases if bushfire, flood or environmentally sensitive land mapping applies. Bushfire-prone land does not automatically exclude complying development, but the dwelling must meet the relevant BAL building work standard and the certifier will require a BAL assessment; BAL-40 and Flame Zone usually force a DA. Flood planning areas often require a DA and elevated floor levels. A DA typically takes two to four months and involves neighbour notification.

Exempt development for non-habitable cabins

A structure that no one lives in (a home office, studio, teenage retreat used by day, store) can qualify as exempt development under the Codes SEPP with no approval at all, if it stays within the limits: generally up to 20 m² floor area in residential zones (50 m² in rural zones), no more than 3 m high, at least 900 mm from boundaries, and behind the building line. Above those limits it needs a CDC or DA as a Class 10a building, which is still simpler than a dwelling. Our 13 m² Nook fits within the residential exempt limits on many lots.

Tiny houses on wheels in NSW

A tiny house on a registrable trailer is a caravan under the Local Government (Manufactured Home Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation. On a lot with an existing dwelling it may be installed without approval if it is occupied only by members of the household, kept registered and roadworthy, and not used as a permanent separate residence or rented out; councils apply local time limits. Shellharbour City Council’s pilot, running to December 2026, waives those limits for compliant THOWs and is being watched as a possible state model. Our pilot explainer and on wheels vs fixed comparison cover the detail.

What the certifier will ask for

  1. A site plan showing the lot, principal dwelling, proposed secondary dwelling, setbacks, site coverage and landscaped area.
  2. Architectural plans, elevations and a Section 10.7 planning certificate for the lot.
  3. Structural engineering certification for the building and footings.
  4. A BASIX certificate for the dwelling’s energy and water performance.
  5. A Bushfire Attack Level assessment if the lot is bushfire-prone.
  6. A stormwater and services plan, and Sydney Water or local water authority approval where applicable.
  7. Subsidence Advisory NSW approval if the lot is in a Mine Subsidence District (common in the Hunter and Illawarra).

Our homes are supplied with the plans, engineering and BASIX-ready specification. You or your certifier add the site-specific documents. Regional detail is in our guides for the Hunter, Central Coast, Illawarra and South Coast, north coast and inland NSW.

Approval note: the pathways described here are general information, not planning advice. Whether a particular site qualifies for any pathway is assessed by an independent building certifier and the relevant council, and approval is never guaranteed. Portable Tiny Homes works with independent certifiers and can connect you with one who assesses your site.

Frequently asked questions

How big can a granny flat be in NSW?

60 m² of floor area under complying development. Larger secondary dwellings are possible via a DA where the LEP allows.

What is the minimum block size for a granny flat in NSW?

450 m² for complying development. Smaller lots can apply through a DA.

Can I rent my NSW granny flat to anyone?

Yes.

Do I need approval for a backyard office pod?

Not if it meets the exempt development limits (generally 20 m² and 3 m high in residential zones). Larger pods need a CDC or DA as a Class 10a building.

Where do I start?

Request a quote with your address and intended use, and we will suggest a model and connect you with an independent certifier in your area who can assess your site.